R2d272 Installation New | Aqmos

requires proper physical placement, precise plumbing plumbing configurations, and accurate digital programming via its . Step 1: Pre-Installation Check & Requirements

: A standard grounded 230V/50Hz electrical outlet is required.

Your checklist should include:

Installing the R2D2-72 involves hydraulic connection to your plumbing, electrical connection, and setting up the drain for regeneration. Step 1: Location and Positioning

Below is a structured, step-by-step guide to the installation and first-time setup of a new Aqmos R2D2-72 system. 📋 Pre-Installation Requirements aqmos r2d272 installation new

Connect the 12 mm wastewater drain hose to the drain port on the control valve. Secure it tightly with a hose clamp.

The R2D272 includes a vertical masking sticker sheet. Cut and apply these over the lens segments to: Step 1: Location and Positioning Below is a

Measure your raw water hardness using a droplet test kit. Access the advanced menu (usually by holding the menu and up/down keys simultaneously for 3-5 seconds) and enter your local German Hardness (°dH) or ppm value.

The Aqmos control valve features clear indicators for water flow direction. Look for the arrows embossed on the valve body representing (incoming hard water) and Outlet (outgoing soft water). The R2D272 includes a vertical masking sticker sheet

Attach the waste water hose (12 mm) to the drain connection on the control valve. Secure it with a hose clamp to prevent leakage. Ensure the other end is secured to the drain system. Step 4: Secure the Unit